info@ukwazi.com+27 (0)12 665 2154
info@ukwazi.com+27 (0)12 665 2154
PGM: Open pit
LOM plan and budget planning
PGM: Open pit
Rehabilitation plan with mine closure cost liabilities and final void estimate based on destination schedule
PGM: Underground
Mining section of pre-feasibility study with hybrid and full mechanised mining method trade-off study
Chrome: Open pit
Mining section of the feasibility study
PGM: Underground
LOM plan and mining method trade-off study
PGM: Underground
Mining section of the pre-feasibility study with a focus on access scenarios
PGM: Underground
LOM plan with mechanised equipment selection for multi face positions and production scheduling
Chrome: Open pit
LOM plan with Reserve estimate and mining section of the CPR and MER
PGM: Underground
LOM plan for multi level reef access and optimisation of the ramp up profile