mining consultants africa

  • 6

    PGM: Underground
    Mining section of pre-feasibility study with hybrid and full mechanised mining method trade-off study

  • 6

    Chrome: Open pit
    Mining section of the feasibility study

  • 6

    PGM: Underground
    LOM plan and mining method trade-off study

  • 6

    PGM: Underground
    Mining section of the pre-feasibility study with a focus on access scenarios

  • 6

    PGM: Underground
    LOM plan with mechanised equipment selection for multi face positions and production scheduling

  • 6

    Chrome: Open pit
    LOM plan with Reserve estimate and mining section of the CPR and MER

  • 6

    PGM: Underground
    LOM plan for multi level reef access and optimisation of the ramp up profile

  • 6

    PGM: Open pit
    LOM plan and budget planning

  • 6

    PGM: Open pit
    Rehabilitation plan with mine closure cost liabilities and final void estimate based on destination schedule